Connecting Northeast Power Grid and directly sending East China Jilin wind power industry to meet new opportunities for development

There are many places suitable for developing wind power, but there are few places where power can be exported. Abandoning wind and nest electricity is a common problem in wind farms. Recently, reporters in Baicheng, Jilin, Tongyu County interview found that the wind power here with the aid of the Tongyu section of the Qingzhou UHV project to achieve the perfect output.

In Tongyu County Huaneng new energy Xinhua wind farm general control room, the reporter saw more than 60 typhoon machines running at full capacity. According to the introduction, the electric field generated 58.1% more last year than last year.

The west of Jilin province is located in the southwest airflow channel between Greater Khingan Range and Changbai Mountains. It is a high quality inland wind field in China. The capacity of the wind power that can be developed in Tongyu county is more than 16 million kilowatts. In 1999, Tongyu county built the first wind farm in Jilin province. In recent years, Huaneng, Longyuan and other companies have invested in this investment. In 2009, the 2 million 300 thousand KW wind power base was built in Jilin Province, but only 495 thousand KW could be connected to the net.

In August 16, 2016, the state approved the construction of the Qingzhou UHV direct current project. After the project was put into operation in February this year, the source of wind power was continuously transported to Qingzhou, Shandong. By the end of 3, the total output of clean energy, including wind power and photovoltaic power in Jilin Province, reached 1 billion 780 million kwh, effectively relieved the problem of the abandoned wind nest in Western Jilin and made clean energy “going out”.

According to the introduction, the project not only directly led to the effective use of the stock of wind power, but also promoted the large-scale development of the wind power base. At present only in Tongyu County, there are 46 wind farms with 50 thousand kilowatts to be built, with a total investment of 20 billion 630 million yuan. All the projects will be completed in 2020.

Clean energy delivery is not limited to wind power, but also photovoltaic power in Tongyu. Up to now, the total installed capacity of photovoltaic grid connected generation in Tongyu is 150 thousand kilowatts. According to the introduction, the Tongyu County PV industry project is directly linked to poverty alleviation. It is expected that by June 30th, the PV Pro poor industry is supported by 11736 customers in the county, and the income of each household is 3000 yuan per year.

As wind power, photovoltaic power and so on through UHV lines “go out”, as well as the continuous increase of clean energy in the local elimination, Jilin wind power industry will usher in new opportunities for development. (Economic Daily reporter Li Jiping)

Leave a Reply